logo
SU-YAPI Engineering & Consulting Inc.

Kahramanmaras - Kisik Dam Potable Water Supply Project

Kahramanmaras - Turkey

Client General Directorate of State Hydraulic Works (DSI)
Partner -
Financing Local
Duration of Services 06/2017 - Ongoing
Brief Description of the Project :

The Project comprises preparation of designs for weir and conveyance line, water treatment plant, and detail designs of depots determined together with water conveyance lines, SCADA and automation designs of the system, and preparation of BoQs and specifications of the system with the objective to build a weir on Cacık Creek to meet water demand of settlement areas in need of urgent water demand until construction of Kısık Dam is completed, to transfer water from weir to water treatment plant, and to distribute treated water to settlement areas in need of urgent water demand within the borders of Kahramanmaraş Province.

Structures under the scope of the Project are;

  • Kısık Weir,
  • 7 km long untreated water conveyance line between Kısık Weir – Treatment Plant,
  • Approximately 195 km long treated water conveyance line for abovementioned settlements,
  • New water treatment plant and flood/outfall line,
  • 13 depots - 1 no 5000 m3, 1 no 1500 m3, 4 Nos 1000 m3, 6 Nos 500 m3 and 1 no 400 m3,
  • Connection lines, which will perform integrated with the system to be designed, to existing Türkoğlu Cumhuriyet (2000 m3) and Türkoğlu Gaziler (1000 m3) depots.
Scope of Services :
  • Acquiring existing documents, on-site observation of the Project area, determining physical characteristics of facilities (water source, depots etc.)
  • Performing water analyses, and determining water quality and sensitivity against contamination,
  • Determining type, capacity and location of project components (water conveyance line, depot) and treatment plant,
  • Preparation of Preliminary Report of Detail Design,
  • Taking into account existing drinking water system of settlement areas while design preliminary report is being prepared for areas determined in the planning report and where branch pipes were added, performing required hydraulic studies and determining design solutions for areas where water will be supplied through branch lines from main conveyance line,
  • Preparation of Feasibility Report,
  • Mapping works on conveyance line route and at locations of facilities
  • Performance of foundation borehole and geological studies for facilities,
  • Performance of hydraulic calculations for water conveyance lines through hydraulic modelling, and determining project characteristics,
  • Preparation of design and calculation reports of detail designs for project components (water conveyance line, water treatment plant) determined by the Client,
  • Preparation of designs of operation and maintenance road (service road) for conveyance lines where needed,
  • Preparation of SCADA and automation designs,
  • Preparation of necessary designs for revision of equipment at maneuver room, if existing depots, which will perform integrated with the system under the scope of the Project, are required to be adapted into SCADA and automation system,
  • Acquiring energy permit for facilities that require energy, preparation of energy supply designs,
  • Performing Geographic Information System (GIS) studies,
  • Preparation of expropriation plans,
  • Preparation of BoQs, tender documents and technical specifications.