Mardin–Nusaybin Railway (Infrastructure, Superstructure) Survey and Design Engineering Services
Mardin, Türkiye
Infrastructure and Superstructure survey, design and engineering services are provided for the 65 km long Mardin-Nusaybin double track high speed railway (project speed 200 km/h). The following services are provided within the scope of the project:
Client
General Directorate of Turkish State Railways (TCDD)
Partner
KMG Proje Müh. Müş. Bilişim Tek. Ltd. Şti. (Turkiye)
Financing
Local
Duration of Services
07/2024 - Ongoing
Brief Description of the Project:
Bridge 7 nos. and total 270 m (Lmax= 50 m)
Viaduct 2 nos. and total 1270 m (Lmax = 1070 m and includes post-tensioned bridge)Scope of Services :
- Transportation
- Transportation Planning
- Highways, Motorways and Bridges
- Rail Transport Systems
- Mardin–Nusaybin Railway (Infrastructure, Superstructure) Survey and Design Engineering Services
- M2 Çayyolu – M3 Sincan Connection Line Final Design Supervision and Consulting Services
- Conversion of Existing Railway Line Between Pamukova and Osmaneli Km: 167+660 - 203+660 to Double Track Line
- İzmir Light Rail System Stage 6, Karabağlar - Gaziemir Line
- Merzifon - Samsun Railway
- Ispartakule - Çerkezköy Railway
- Manavgat - Seydişehir Railway
- Ulukışla – Yenice Railway
- The Bosphorus Rail Tube Crossing Project (MARMARAY) Design Services for Construction of the Tunnel and Stations Under Contract BC-1
- Ankara - İzmir Railway
- Upgrading the Infrastructure and Operation of İzmir Railway System
- Ankara Rail Mass Transit Project, Ankara Subway Project
- Tunnels