The project is the survey design and engineering services for the high-speed railway line between Ispartakule - Çerkezköy with a design speed of 200 km/h and a length of 66.84 km, within the scope of the Halkalı-Kapıkule New Railway Construction. In addition to this railway line; by taking the execution (or not) of the Istanbul Canal Project, railway design between Halkalı- Ispartakule, which is on the continuation of Ispartakule Station; 8.19 km Istanbul Canal Tunnel Crossing and 8.97 km Halkalı Level Crossing were also designed within the scope of the contract. Services performed within the scope of Halkalı-Ispartakule-Çerkezköy New Railway Construction work; 66.84 km long Ispartakule- Çerkezköy double line high speed railway design (Preliminary Design, Final Design, Superstructure Design and Drainage Design), 8,97 km Halkalı Level Crossing (Final Design, Superstructure Design and ground studies engineering services), 8,19 km İstanbul Canal Crossing design (Final Design, Superstructure Design and ground studies engineering services), 66,84 km ground studies engineering services, 2 nos. Bored Tunnel (L=2425 m and L=360 m Total:2785 m) detail design and preparation of reports, 2 nos. Tunnel Design (T1=5987 m and T2=5968 m), 9 nos. Double Line Railway Bridge (Total 1040 m) detail design and calculations, 2 nos. Double Line Railway Viaduct (Total L=880 m) detail design and calculations, 66,84 km Electrification, Signaling, Telecommunication Designs, 9 nos. Bridge Design (Total L=1040 m), 4 nos. Cut-and-Cover Tunnel (Total L=2360 m), 23 nos. Highway Underpass Design, 17 nos. Highway Overpass Design, 109 nos. Box Culvert Design, 1 no. station and 1 no. sayding design, Preparation of quantity surveys and construction tender documents.
Client
General Directorate of Turkish State Railways (TCDD)
Partner
KMG PROJE Müh. Müş. Bil. Tek. Ltd. Şti. (Turkey)
Financing
Local
Duration of Services
09/2016 - 09/2019
Brief Description of the Project:
Scope of Services :
- Transportation
- Transportation Planning
- Highways, Motorways and Bridges
- Rail Transport Systems
- Mardin–Nusaybin Railway (Infrastructure, Superstructure) Survey and Design Engineering Services
- M2 Çayyolu – M3 Sincan Connection Line Final Design Supervision and Consulting Services
- Conversion of Existing Railway Line Between Pamukova and Osmaneli Km: 167+660 - 203+660 to Double Track Line
- İzmir Light Rail System Stage 6, Karabağlar - Gaziemir Line
- Merzifon - Samsun Railway
- Ispartakule - Çerkezköy Railway
- Manavgat - Seydişehir Railway
- Ulukışla – Yenice Railway
- The Bosphorus Rail Tube Crossing Project (MARMARAY) Design Services for Construction of the Tunnel and Stations Under Contract BC-1
- Ankara - İzmir Railway
- Upgrading the Infrastructure and Operation of İzmir Railway System
- Ankara Rail Mass Transit Project, Ankara Subway Project
- Tunnels