Ulukışla – Yenice Railway
Niğde, Adana - Turkey - General Directorate of Turkish State Railways (TCDD)
TEMAT Teknik Ek. ve Mali Araşt. Tic. A.Ş. (Turkey) Survey, design and engineering services for 106,08 km long Ulukışla - Yenice high speed railway (Project speed 200 km/h). Route Corridor Survey for 106,51 km long double-track fast railway route, Preliminary Design, Final Design, Superstructure Design and Drainage Design for 106,08 km long double-track fast railway route, Hydraulic and hydrological surveys and preparation of reports, 106,08 km ground survey engineering services Preparation of 1/2000 scale photogrammetric maps for 106,08 km long railway route, Carrying out hydraulic and hydrological studies, preparation of route plans and profiles, drainage / platform / link road drawings and cross-sections and calculation of soil volumes, all within scope of Final Design, Preparing Final designs for small and large engineering structures, Bridges 26 Nos, Total: 5960 m Superstructure and wire-fence design of 106,08 km long railway route, Design of 2 Nos railway station and 1 No siding structure, Preparation of land acquisition plans for 106,08 km long railway route, and Within the scope of the tender documents for the construction of the route; preparation of construction document contracts and specifications together with exploration and quantity surveys .
Client
General Directorate of Turkish State Railways (TCDD)
Partner
Financing
Local
Duration of Services
08/2015 - 08/2020
Brief Description of the Project:
Viaducts 3 Nos, Total 1925 m
(V1 Hmax:75,80 m post tension, V2 Hmax:38 m pre-tension + post tension, V3 Hmax:76,90 m post tension)
Cut-cover Tunnels 8 Nos, Total: 1321 m
Tunnels 28 Nos, 48832 m NATM
Underpasses 34 Nos
Overpasses 14 Nos
Railway Underpasses 1 No
Box Culverts 90 Nos
Scope of Services :
- Transportation
- Transportation Planning
- Highways, Motorways and Bridges
- Rail Transport Systems
- Mardin–Nusaybin Railway (Infrastructure, Superstructure) Survey and Design Engineering Services
- M2 Çayyolu – M3 Sincan Connection Line Final Design Supervision and Consulting Services
- Conversion of Existing Railway Line Between Pamukova and Osmaneli Km: 167+660 - 203+660 to Double Track Line
- İzmir Light Rail System Stage 6, Karabağlar - Gaziemir Line
- Merzifon - Samsun Railway
- Ispartakule - Çerkezköy Railway
- Manavgat - Seydişehir Railway
- Ulukışla – Yenice Railway
- The Bosphorus Rail Tube Crossing Project (MARMARAY) Design Services for Construction of the Tunnel and Stations Under Contract BC-1
- Ankara - İzmir Railway
- Upgrading the Infrastructure and Operation of İzmir Railway System
- Ankara Rail Mass Transit Project, Ankara Subway Project
- Tunnels