Upgrading the Infrastructure and Operation of İzmir Railway System
İzmir - Turkey
For the Municipality’s intra-city rail mass transit operations on TCDD lines in total 80 km length between Basmane - Çiğli - Menemen - Aliağa, Alsancak – Cumaovası and Şirinyer - Buca stations, the following studies have been carried out by the Consultant:
Client
İzmir Metropolitan Municipality
Partners
Yapı Teknik Müh. Müş. Ltd. Şti.(Turkey)
Mott MacDonald Ltd. (UK)
Financing
Local
Duration of Services
2000 – 2002
Brief Description of the Project :
Scope of Services :
- Transportation
- Transportation Planning
- Highways, Motorways and Bridges
- Rail Transport Systems
- Mardin–Nusaybin Railway (Infrastructure, Superstructure) Survey and Design Engineering Services
- M2 Çayyolu – M3 Sincan Connection Line Final Design Supervision and Consulting Services
- Conversion of Existing Railway Line Between Pamukova and Osmaneli Km: 167+660 - 203+660 to Double Track Line
- İzmir Light Rail System Stage 6, Karabağlar - Gaziemir Line
- Merzifon - Samsun Railway
- Ispartakule - Çerkezköy Railway
- Manavgat - Seydişehir Railway
- Ulukışla – Yenice Railway
- The Bosphorus Rail Tube Crossing Project (MARMARAY) Design Services for Construction of the Tunnel and Stations Under Contract BC-1
- Ankara - İzmir Railway
- Upgrading the Infrastructure and Operation of İzmir Railway System
- Ankara Rail Mass Transit Project, Ankara Subway Project
- Tunnels





