Ankara - İzmir Railway
Ankara, Afyon, İzmir - Turkey
Survey, design and engineering services for 600 km long Ankara-Polatlı-Afyon-İzmir railway. (Project speed 250 km/h)
Client
Republic of Turkey
Ministry of Transportation
General Directorate of State Railways, Ports and Airports (DLH)
Partner
Yüksel Domaniç Müh. Müş. Ltd. Şti.
Financing
Local
Duration of Services
2004 – 2006
Brief Description of the Project:
Scope of Services :
- Transportation
- Transportation Planning
- Highways, Motorways and Bridges
- Rail Transport Systems
- Mardin–Nusaybin Railway (Infrastructure, Superstructure) Survey and Design Engineering Services
- M2 Çayyolu – M3 Sincan Connection Line Final Design Supervision and Consulting Services
- Conversion of Existing Railway Line Between Pamukova and Osmaneli Km: 167+660 - 203+660 to Double Track Line
- İzmir Light Rail System Stage 6, Karabağlar - Gaziemir Line
- Merzifon - Samsun Railway
- Ispartakule - Çerkezköy Railway
- Manavgat - Seydişehir Railway
- Ulukışla – Yenice Railway
- The Bosphorus Rail Tube Crossing Project (MARMARAY) Design Services for Construction of the Tunnel and Stations Under Contract BC-1
- Ankara - İzmir Railway
- Upgrading the Infrastructure and Operation of İzmir Railway System
- Ankara Rail Mass Transit Project, Ankara Subway Project
- Tunnels





