M2 Çayyolu – M3 Sincan Connection Line Final Design Supervision and Consulting Services
Ankara, Türkiye
Within the scope of the project, the Çayyolu (M2)-Sincan (M3) Metro Connection Line (M6), which is a part of the Ankara Rail Mass Transit System determined within the framework of the Ankara Urban Transportation Plan, will be 11 km long and consist of 5 stations. With this line, the transit time between Çayyolu-Sincan lines will be shortened and integration with Başkentray and YHT lines will be ensured. Design Supervision and Consultancy services are provided for the Architectural, Structural Design, Mechanical, Electromechanical, Environmental Planning, Landscaping, Irrigation and Lighting Designs prepared by the Project Contractor for the Çayyolu (M2) - Sincan (M3) Metro Connection Line (M6). Following shall be performed for the studies prepared by the project contractor;
Client
EGO General Directorate
Transportation Planning and Rail System Department
Partner
-
Financing
Local
Duration of Services
06/2024 - Ongoing
Brief Description of the Project:
Scope of Services :
- Transportation
- Transportation Planning
- Highways, Motorways and Bridges
- Rail Transport Systems
- Mardin–Nusaybin Railway (Infrastructure, Superstructure) Survey and Design Engineering Services
- M2 Çayyolu – M3 Sincan Connection Line Final Design Supervision and Consulting Services
- Conversion of Existing Railway Line Between Pamukova and Osmaneli Km: 167+660 - 203+660 to Double Track Line
- İzmir Light Rail System Stage 6, Karabağlar - Gaziemir Line
- Merzifon - Samsun Railway
- Ispartakule - Çerkezköy Railway
- Manavgat - Seydişehir Railway
- Ulukışla – Yenice Railway
- The Bosphorus Rail Tube Crossing Project (MARMARAY) Design Services for Construction of the Tunnel and Stations Under Contract BC-1
- Ankara - İzmir Railway
- Upgrading the Infrastructure and Operation of İzmir Railway System
- Ankara Rail Mass Transit Project, Ankara Subway Project
- Tunnels





