Within the scope of the project, it is planned to convert the Pamukova-Osmaneli railway into a double track in order to increase the railway transportation capacity between Ankara and Istanbul and to raise the railway standards. For this purpose, studies are being carried out to convert the existing single-track railway, approximately 36 km long between Sarmaşık Station and Pamukova Stations, into double-track.
Client
General Directorate of Turkish State Railways (TCDD)
Partner
KMG PROJE Eng. Cons. Information Tech. Ltd. Co. (Turkey)
TCDD Technical Engineering and Consulting Inc. (Turkey)
Financing
Local
Duration of Services
11/2023 - Ongoing
Brief Description of the Project:
Scope of Services :
- Transportation
- Transportation Planning
- Highways, Motorways and Bridges
- Rail Transport Systems
- Mardin–Nusaybin Railway (Infrastructure, Superstructure) Survey and Design Engineering Services
- M2 Çayyolu – M3 Sincan Connection Line Final Design Supervision and Consulting Services
- Conversion of Existing Railway Line Between Pamukova and Osmaneli Km: 167+660 - 203+660 to Double Track Line
- İzmir Light Rail System Stage 6, Karabağlar - Gaziemir Line
- Merzifon - Samsun Railway
- Ispartakule - Çerkezköy Railway
- Manavgat - Seydişehir Railway
- Ulukışla – Yenice Railway
- The Bosphorus Rail Tube Crossing Project (MARMARAY) Design Services for Construction of the Tunnel and Stations Under Contract BC-1
- Ankara - İzmir Railway
- Upgrading the Infrastructure and Operation of İzmir Railway System
- Ankara Rail Mass Transit Project, Ankara Subway Project
- Tunnels