Berdan Dam Irrigation System Renovation Planning Engineering Services

Mersin - Turkey

Client DSI 6th Regional Directorate - Adana
Partner -
Financing Local
Duration of Services 08/2017 - 12/2021
Brief Description of the Project:

Berdan Dam Irrigation area is located in the Mediterranean Region, in the Eastern Mediterranean Basin number 17 and within the borders of Mersin Province Center (Akdeniz, Mezitli, Toroslar and Yenişehir Central Districts) and Tarsus Districts.

With Berdan Dam Irrigation, conversion of 15798 ha rehabilitation area, 2711 ha with additional areas, a total of 18509 ha, and with Pamukluk Dam Irrigation and 7550 ha rehabilitation area irrigated from Berdan Dam (6995 ha converted from pumped irrigation to gravity) and a total of 11080 ha areas with 3530 ha additional areas to closed pipe system and the technical and economic feasibility of irrigation facilities were revealed .

Scope of Services:
  • Preparation of Interim Engineering Hydrology Planning Report
  • Preparation of Interim Engineering Geology and Natural Construction Materials Reports
  • Preparation of Interim Preliminary Investigation Revision and Additional Area Land Classification and Drainage Report
  • Preparation of Interim Agricultural Renovation Economy and Expropriation Planning Reports
  • Preparation of Interim Planning Report
  • Preparation of Engineering Hydrology Planning Report
  • Preparation of Engineering Geology and Natural Construction Materials Planning Reports
  • Preparation of Planning Revision and Additional Area Land Classification and Drainage Report
  • Preparation of Agricultural Renovation Economy and Expropriation Planning Reports
  • Preparation of EIA Report or EIA Project Information File
  • Performance of Geographical Information System (GIS) Studies
  • Preparation of Planning Report