Uzbekistan - Bukhara Region Water Supply and Sewerage Project
Uzbekistan
Investment in Water Supply Infrastructure: The investment in Water Supply Infrastructure will cover the construction and rehabilitation of main water lines, well fields and intakes, associated electric facilities, water treatment plants, pumping stations, water reservoirs, distribution networks including house connections and equipment. The water supply system project will be implemented in Kagan, Karaulbazar, Ramitan, Peshkun, Bukhara, Zhandar districts and Bukhara and Kagan of Bukhara region. Mainly the structures to be constructed are as follows: Reconstruction works: • 1 pumping station, • Shahrud junction, • 28 water distribution units (WDU), • 729.4 km of internal networks, • 46 km of water pipelines, Construction Works: • 15 WDU, • 961.9 km of internal networks, • 509.7 km water pipelines, • procurement of equipment and decommissioning of obsolete components. The following contract packages covering several lots of water supply system will be constructed within the scope of the services. No: BWSP-W1-3 (Central buildings - 3 lots) Construction and reconstruction: Water intake with a pumping station of the 1st rise, IbnSino-Shokhrud water conduit Ø 1000 mm - 14.5 km, Shakhrud junction (WTP and WDU), Shahrud-Zarafshan water pipeline Ø 700 mm, Ring water conduit and existing "Zarafshan-Bukhara" water conduit with a length of 1.5 km, Ø 700 mm, "Zarafshan No. 2" WDU No: BWSP – W4-10 (Bukhara city and Bukhara region - 7 lots) Construction and reconstruction: Water supply networks and circular water conduit of the city of Bukhara. Production operational base of “Bukhoro suv ta’minot” LLC; 6 –WDU, Supply water pipelines and water supply networks of Bukhara region; No: BWSP – W11-14 (Jandar district - 4 lots) Construction and reconstruction: 12-WDU, Main and supply water pipelines, water supply networks of the Jandar district No: BWSP – W15-19 (Kagan city and Kagan district - 5 lots) Construction and reconstruction: WDU "Kagan", water supply networks of the city of Kagan; 8 –WDU, Main and supply water pipelines, water supply networks of the Kagan region; No: BWSP-W20 (Karaulbazar district - 1 lot) Construction and reconstruction: 2-WDU, Main and supply water pipelines, water supply networks of the Karaulbazar region No: BWSP – W21-25 (Peshku district - 5 lots) Construction and reconstruction: 6-WDU, Main and supply water pipelines, water supply networks of the Peshku district No: BWSP – W26-28 (Ramitan region - 3 lots) Construction and reconstruction: 7-WDU, Main and supply water pipelines, water supply networks of Ramitan region. Investment in Sewerage Infrastructure The investment in Sewerage Infrastructure will cover the construction of centralized sewage systems in district centers consisting of house connections, collectors, pumping stations and mechanical-biological sewage treatment plants as well as discharge facilities, optionally tertiary treatment for reuse purposes. The sewerage supply system project will be implemented in regional centers of Gijduvan, Ramitan, Karakul, Alat and Karaulbazar districts of Bukhara region. Mainly the structures to be constructed are as follows: Reconstruction Works: • 1 pumping station (SPS), Construction Works: • 5 sewage treatment plants (STP), • 66 SPS, • 32.1 km of sewer collectors, • sewer networks 581.2 km, • 974.2 km of house sewer connections, • purchase of equipment and withdrawal out of service obsolete components. The following contract packages covering several lots of sewerage system will be constructed within the scope of the services. No: BWSP-S1-3 (Gijduvan district center - 3 lots) Construction of house connections, sewer networks and pressure pipelines, 14 SPS, 1 STP in the district center of Gijduvan. No: BWSP–S4-6 (Alat district center - 3 lots) Construction of house connections, sewer networks and pressure pipelines, 18 SPS, 1 STP in the district center of Alat. No: BWSP–S7-9 (Karakul district center - 3 lots) Construction of house connections, sewer networks and pressure pipelines, 14 SPS, 1 STP in the district center of Karakul. No: BWSP–S10-11 (Ramitan district center - 2 lots) Construction of house connections, sewer networks and pressure pipelines, 14 SPS, 1 STP in the district center of Ramitan. No: BWSP–S12 (Karaulbazar district center - 1 lots) Construction of house connections, sewer networks and pressure pipelines, 6 SPS, 1 STP in the district center of Karaulbazar.
Client
JSC “Uzsuvtaminot”
Partner
Dar Al-Handasah Consultants (Shair and Partners) s.a.l.
Financing
Asian Infrastructure Investment Bank (AIIB)
Duration of Services
12/2022 - Ongoing
Brief Description of the Project :
Scope of Services :
- Municipal Infrastructure
- Water Supply and Distribution
- Water Treatment Plants
- Wastewater and Stormwater Drainage
- ASO 1st Organized Industrial Zone 7th Section Expansion Area Infrastructure Construction Consultancy Services
- Preparation of Wastewater and Stormwater Separation Projects in Various Roads and Streets of Çiğli, Karşıyaka and Bayraklı Districts of İzmir Province
- Uzbekistan - Bukhara Region Water Supply and Sewerage Project
- Osmaniye Water Supply and Sewerage Project
- Ankara Province Drinking Water, Wastewater and Stormwater Management Master Plan
- Uzbekistan - Reconstruction and Expansion of the Sewerage Systems of Gulistan, Shirin and Yangiyer cities of Syrdarya Region
- Muğla Wastewater Project
- Uzbekistan - Djizzak City Sanitation System Development Project
- Preparation of Master Plan for Stormwater Infrastructure and Related Services of Mersin City (MPÇ-YS1)
- Detail Design for Wastewater and Stormwater System of Bursa City Mustafakemalpaşa District and Related Villages
- Technical Assistance and Construction Supervision for Adıyaman Wastewater Project
- Azerbaijan - Consultancy Services for Water and Wastewater Networks, WTP and WWTP in 22 Regions
- Consultancy Services for Construction and Rehabilitation of Sewerage and Stormwater Networks in Denizli
- Construction Supervision of Yalova Çınarcık, Teşvikiye, Kocadere and Esenköy Sewerage Systems, Wastewater Treatment Plant and Sea Outfall
- Antalya Sewerage System Construction and Water Network Rehabilitation Project
- Detailed Design for Wastewater and Stormwater Networks, Overflow Structures and Wastewater Treatment Plant in Central Districts of Ankara
- Wastewater Treatment Plant, Stormwater and Wastewater Project of Çubuk Catchment
- Kastamonu Water Supply and Sanitation Project
- Siirt Water Supply and Sanitation Project
- Batman Water Supply and Sanitation Project
- Infrastructural Project for Koalack, Louga and St. Louis in Senegal
- Aliağa Organized Industrial Zone Consultancy Services for Infrastructure Works
- Antalya Water Supply and Sanitation Project (Contract No. C62)
- İzmir Large Canal Project, Southern Sewer Collectors
- Antalya Water Supply and Sanitation Project (Contract No.C61)
- Greater Ankara Sewerage and Stormwater Project (BAKAY)
- Wastewater & Stormwater Drainage - Other References
- Wastewater Treatment Plants
- Solid Waste Management
- Institutional Strengthening and Technical Assistance