Adıyaman, TURKEY

Client Ministry of Environment and Urbanization
Department of European Union Investments
Partner Fichtner GmbH (Germany)
Dorsch GmbH (Germany)
Financing European Union
Duration of Services 05/2013 – 12/2017
Brief Description of the Project :

Adıyaman is a provincial centre located in central Fırat River basin in the South-East Anatolia Region and is one of nine provinces in the scope of the largest regional development project in Turkey, the South-East Anatolia Project (GAP). The services under the project include, technical assistance and capacity building programmes for PIU and Water Utility Department, support to supply component, design review of WWTP, collector, rising mains, siphon and pumping stations and also construction supervision of WWTP.  

The characteristics knowledge of the project components are given below:

WWTP                                                2025                     2040

Population (Inhabitants)            245,490               301,160
Daily hydraulic load (m3/day)      32,817                 43,634
Qmax (m3/hour)                                  2,878                    3,791
COD (kg/day)                                    22,021                 30,026
BOD5 (kg/day)                                  11,107                 15,131         

Parameter                           Design criteria (inlet)      Design criteria (outlet)   Removal efficiency (%)

BOD5 (mg/l)                       338                                         25                                     93
COD (mg/l)                          671                                      125                                      81

The details for the wastewater collector, rising mains, siphon and pumping stations constructed in the scope of this project, are shown below:

Type of structure                            Size (m)                Further Details

Wastewater Collector Mains

Concrete                                            11,944                 DN 300 to DN 500
Reinforced Concrete                       12,910                 DN 800 to DN 1200
Total                                                    26,855

Inverted Siphon Line

PN 10, PE 100                                    1,380                 DN 140 and DN 280
PN 10, PE 101                                       690                  DN 160
Total                                                      2,070                  

Rising Mains

PN 10, PE 100                                    1,640                 DN 630

Total                                                    30,565

Pumping Station Structures:

Formed of rock trap, coarse grid and pumping station structures and supplies water to treatment plant.
Rock trap: Vented type. Entry and exit have sliding covers for insulation purposes.
Coarse Grid: 80 mm spaced manual, 50 mm spaced mechanical coarse grid, with 1800 m3/h capacity
Pump Type: Immersion centrifuge
Number of Pumps: 4= 3 main+1 spare
Pump flow: 600 m3/h
Total flow: 1800 m3/h

Scope of Services :
  • Technical assistance and capacity building programmes for PIU and Water Utility Department,
  • Technical assistance and capacity building in administrative and financial issues,
  • Technical assistance and capacity building within technical operation and maintenance,
  • Geographical Information System (GIS) studies and mapping studies,
  • Establishing the hydraulic modelling of the existing water network system,
  • Leak detection and none revenue water programme,
  • Assistance in preparation of water resource protection plan,
  • Preparation of sludge management plan,
  • Support to supply component and assistance during tendering and awarding contract,
  • Design review of WWTP and other infrastructural designs,
  • Preparation of Construction tender documentation,
  • Construction supervision of WWTP.