Muğla Wastewater Project

Muğla - Turkiye

Client Muğla Water and Sewerage Administration (MUSKİ)
Partner CES Consulting Engineers Salzgitter GmbH
Financing World Bank (IBRD)
Duration of Services 09/2018 - Ongoing
Brief Description of the Project :

İLBANK has obtained financing in the form of a "loan" from the International Bank for Reconstruction & Development (IBRD) in order to meet the cost of the Sustainable Cities Project. İLBANK has allocated a portion of the sum of this loan to Muğla Water and Sewerage Administration (MUSKİ) towards the cost of Muğla Waste Water Project. MUSKİ intends to procure Consulting Services under the scope of the mentioned loan.

In scope of the Project, services will be performed with two contract packages.

  1. Design, Reviewing of Designs, Preparing Tender Documents for Muğla Wastewater Project (MUS C1/A) Works under the scope of this contract package has been completed on 08.09.2021.

  2. Construction Supervision Services for Muğla Wastewater Project (MUS C1/B)

Following works will be performed;

  • (MUS-W1) Turgutreis Wastewater Treatment Plant Phase 1 (37.000 m3/day) and Deep-Sea Outfall Construction (1500 m long PE 100 deep-sea outfall with a diameter of 800 mm and 1850 m long HDPE PE100 PN10 SDR17 onshore network construction with a diameter of 1000 mm)

  • (MUS-W2) Bodrum Sewerage Network Construction (158 km- Ø 200-500 mm network, collector, force main and 14 nos. concrete and 7 nos. package Wastewater Pumping Station)

  • (MUS-W3) Rehabilitation of Existing Wastewater Treatment Plants, Rehabilitation Construction of Gümbet (29.900 m3/day) and Gümüşlük (9.900 m3/day) WWTP’s.

  • (MUS-W5) Fethiye Hisarönü and Ovacık Sewerage Network Construction (119 km- Ø 200-500 mm HDPE SNS 8 networks, collector, HDPE PE100 force main and 2 nos. concrete and 1 no. package Wastewater Pumping Station)

  • (MUS-W7) Fethiye WWTP Phase II. Construction (25.000 m3/day)

  • (MUS-W8) Rehabilitation and/or re-construction of 118 km long network in Marmaris, Dalyan, Ortaca, Bodrum and Fethiye Districts.

  • (MUS2-W2) Milas District Ören Neighborhood Sewerage Network Construction (119 km- Ø 200-500 mm HDPE SNS 8 networks, collector, HDPE PE100 force main and 2 nos. concrete and 1 no. package Wastewater Pumping Station)

  • (MUS2-W4) Ören WWTP Construction (Capacity 8.000 m3/day, preparation works for Conceptual Designs and Tender Documents)

Scope of Services :

Contract (MUS-C1/A) Services

  • Reviewing Design,
  • Detailed Design,
  • Preparing Tender Documents,
  • Providing Technical Assistance during Tender and Agreement Process.

Contract (MUS-C1/B) Services

  • Construction Supervision,
  • Defect Liability Period Services.