Azerbaijan, Khanarc Canal Project
Azerbaijan
New Khanarc Canal Project is the second ranked component of the Samur Apsheron Irrigation and Water Supply System. The length of main canal is 67.2 km and the irrigation area is 62.547 ha. The civil structures for which final designs have been prepared are as follows:
Client
Republic of Azerbaijan
The State Amelioration and Irrigation Committee (SAIA)
Partner
-
Financing
Islamic Development Bank (IDB)
Duration of Services
1999 – 2000
Brief Description of the Project :
Scope of Services :
- Dams and Water Resources
- Dams
- Irrigation & Drainage Systems
- Kyrgyzstan - Climate Resilient Water Services Project (CRWSP)
- Tokat-Kazova Left and Right Bank Irrigations Renewal Project
- Kazakhstan, Rehabilitation of Irrigation and Drainage Project
- Georgia, Kvemo Samgori, Tbisi-Kumisi and Zeda Ru Irrigation Systems
- Azerbaijan, Upper Şirvan Canal Project
- Uzbekistan, Improvement of Water Resources Management in Surkhandarya Region (Reconstruction of Canals System Khazarbag-Akkapchigay)
- Azerbaijan, Water Users Association Development Support Project (WUAP)
- Tunca (Suakacağı) Dam and HEPP Irrigation Project
- Azerbaijan, Irrigation Distribution System and Management Improvement Project (IDSMIP)
- Libya, Sirt END and Sirt B Pump Stations
- Azerbaijan, Velvelichay – Tahtakorpu Conveyance Canal
- Azerbaijan, Khanarc Canal Project
- Atabey and Keçiborlu Plains Irrigation Project
- Mardin - Ceylanpınar Plains Irrigation Project
- Irrigation & Drainage Systems - Other References
- Water Resources Planning
- River Rehabilitation & Flood Protection
- Agricultural Development Planning & Training





