Lower Kaleköy Dam and HEPP

Bingöl, Turkey

Client DSİ 9th Regional Directorate - Elazığ
Partner -
Financing External Source (Investor)
Duration of Services 04/2018 – 06/2020
Brief Description of the Project :

Lower Kaleköy Dam is located approximately 25 km southeast of Bingöl Province and 15 km upstream of Genç district on Murat River.

Height from foundation is 107 meters and it is the first roller compacted concrete dam + asphalt core rockfill composite type dam in Turkey. The total storage volume has a storage capacity of 556.30 hm3 and its installed capacity is 500 MW.

Design characteristics of dam;

Dam Type : RCC+ Asphalt Core Rockfill (Composite)
Crest Elevation : 1105 m (RCC)  1107 m (Asphalt)
Crest Length : 945 m
Height from Thalweg : 95 m
Height from Foundation : 107 m
Dam Volume : 1.900.000 m3 (RCC) + 3.366.000 m3 (Fill)
Number of Units : 4
Turbine Type : Vertical Axis Francis
Unit Power : 3 x 155.5 MW + 1 x 33.53 MW
Total Installed Power : 500 MW
Annual Power Generation : 1 193,17 GWh/year
Scope of Services :
  • Supervision of Detail Designs,
  • Supervision and Approval of As-Built Designs,
  • Construction Supervision Services.