Ukraine, Urengoy-Pomary-Uzhgood Main Natural Gas Pipeline
Ukraine
Within the scope of Procurement and Project Management Consultant Services – Project “Reconstruction, capital repairs and technical re-equipping of the main Pipeline Urengoy-Pomary-Uzhgood” funded by World Bank, European Bank for Reconstruction and Development, European Investment Bank and European Union, it is agreed to provide “Procurement and Project Management Services” for urgent reconstruction required to be carried out for 1.139 km section – within Ukraine - of approximately 4.500 km long natural gas pipeline (UPU Pipeline) of which construction had been completed in 1989 and had been taken into operation and which connects Urengoy District of Russia and Uzgorod District of Ukraine. Within the scope of the Project, total 119 km out of 1139 km of natural gas pipeline including valves and other instruments, with the diameter of 56” shall be reconstructed/renewed in 4 separate sections and 2 turbo compressors in Romny compressor station, located on the line, shall be replaced.
Client
Public Joint Stock Company UKRTRANSGAZ
Partner
-
Financing
World Bank, EBRD, EIB, EU
Duration of Services
05/2016 – 07/2018
Brief Description of the Project :
Scope of Services:
- Energy
- Hydroelectric Power Plants
- Oil & Natural Gas
- TurkStream Project Operation Support Services Engineering Services
- Ukraine, Urengoy-Pomary-Uzhgood Main Natural Gas Pipeline
- TANAP - Trans Anatolian Natural Gas Pipeline Project
- NABUCCO Natural Gas Pipeline Project Between Turkish/Georgian Border (Posof) - Ankara Pipeline Section Engineering Services
- NABUCCO - Natural Gas Pipeline Project Between Ankara – Turkish/Bulgarian Border Pipeline Section Engineering Services
- NABUCCO - Turkey – Austria Natural Gas Pipeline Project Turkish Section Engineering Services and Feasibility Study
- Wind Energy





