TEFER Project - Repair and Improvement of Flood Protection Infrastructure in Western Black Sea Region
Bartın, Bolu, Karabük
The "Repair and Improvement of Flood Protection Infrastructure" is a component of the "Turkey Emergency Flood and Earthquake Recovery Project" (TEFER). Construction supervision services under the project were provided for flood protection structures in the following locations in the Western Black Sea Region.. Group 1: Group 2: Group 4: Group 5:
Client
General Directorate of State Hydraulic Works (DSİ)
Partner
-
Financing
World Bank
Duration of Services
2002 – 2003
Brief Description of the Project:
The works that will be carried out on site are limestone excavation on the left-right bank and riverbed training, riprap protection on the slopes, extension and reconstruction of bridges, construction of embankments with gabion mattress slope and toe protection, concrete lining and construction of roads on Bartın and Kozcağız river alignments.
The works that will be carried out on site are limestone excavation on the left-right bank and river bed training, riprap protection on the slopes, extension and reconstruction of bridges, construction of embankments with gabion mattress slope and toe protection, concrete lining, construction of roads and drainage works on Bolu Büyüksu and Seben Aladağ river alignments.
The works that will be carried out on site are limestone excavation on the left-right bank and river bed training, riprap protection on the slopes, extension and reconstruction of bridges, construction of embankments with gabion mattress slope and toe protection, construction of gravity flood protection and reinforced concrete walls, concrete lining, construction of roads and drainage works on Cihanbeyli and Yenice river basins.
The works that will be carried out on site are limestone excavation on the left-right bank and river bed training, riprap protection on the slopes, extension and reconstruction of bridges and box culverts, construction of embankments with gabion mattress slope and toe protection, construction of gravity flood protection and reinforced concrete walls, concrete lining, construction of roads and drainage works on Karabük river alignment.Scope of Services :
- Dams and Water Resources
- Dams
- Irrigation & Drainage Systems
- Water Resources Planning
- River Rehabilitation & Flood Protection
- Uzbekistan - Flood Modeling and River Rehabilitation Planning, Design and Consultancy Services in Daryo Bo Business City Section of Chirchik River
- Seyhan River Flood Risk Maps Preparation
- Göksu River Flood Protection and River Rehabilitation Feasibility Report
- Detailed Design for Wastewater and Stormwater Networks, Overflow Structures and WWTP in Central Districts of Ankara
- Wastewater Treatment Plant, Stormwater and Wastewater Project of Çubuk Catchment
- Eskişehir Municipal Urban Development Project Component 2 – Natural Disaster Risk Minimisation Project
- TEFER Project - Repair and Improvement of Flood Protection Infrastructure in Western Black Sea Region
- Filyos Creek Basin Master Plan Revision and Planning Project
- River Rehabilitation & Flood Protection - Other References
- Agricultural Development Planning & Training