Wastewater Treatment Plant, Stormwater and Wastewater Project of Çubuk Catchment
Ankara
Detail Design and tender documentation for wastewater, stormwater, creek improvement and wastewater treatment systems for Esenboğa, Sirkeli, Altınova, Upper Çavundur, Pursaklar and Sarayköy municipalities within Çubuk and Akyurt Sub-provinces, Karacaören (Altındağ Sub-province) and Upper Gicik (Altınova Municipality) districts further to 97 nos villages reporting to these municipalities in Çubuk Catchments area in Ankara City. Detail design of wastewater collectors and networks (1147 km) Detail design of stormwater collectors and networks (153 km) Detail design, tender documents and EIA introductory documents for Çubuk Waste Water Treatment Plant (41.000 m3/d equivalent population 180.000 (target year 2030) capacity biological treatment plant) Detail design, tender documents and EIA introductory documents for Karaköy Waste Water Treatment Plant (132.000 m3/d equivalent population 486.000 (target year 2030) capacity biological treatment plant) Detail design, tender documents and EIA introductory documents for Sirkeli Waste Water Treatment Plant (5.500 m3/d equivalent population 20.000 (target year 2030) capacity biological treatment plant) Detail Design and tender documents for procurement and operation of Package Treatment System (3 No.) Geotechnical report and soil investigations (400 m) Geotechnical report for wastewater and stormwater networks area Detail design for river rehabilitation (22 km) Detail design, tender documents and EIA introductory documents for sand trap and overflow structure (57 No.) Preparation of Land acquisition and cadastral plans (4 km) Detail design and tender documents for septic tank, network and natural treatment plant in villages (97 No.).
Client
Ankara Water and Sewerage Administration (ASKİ)
Partner
-
Financing
Local
Duration of Services
2005 – 2008
Brief Description of the Project:
Scope of Services:
- Dams and Water Resources
- Dams
- Irrigation & Drainage Systems
- Water Resources Planning
- River Rehabilitation & Flood Protection
- Uzbekistan - Flood Modeling and River Rehabilitation Planning, Design and Consultancy Services in Daryo Bo Business City Section of Chirchik River
- Seyhan River Flood Risk Maps Preparation
- Göksu River Flood Protection and River Rehabilitation Feasibility Report
- Detailed Design for Wastewater and Stormwater Networks, Overflow Structures and WWTP in Central Districts of Ankara
- Wastewater Treatment Plant, Stormwater and Wastewater Project of Çubuk Catchment
- Eskişehir Municipal Urban Development Project Component 2 – Natural Disaster Risk Minimisation Project
- TEFER Project - Repair and Improvement of Flood Protection Infrastructure in Western Black Sea Region
- Filyos Creek Basin Master Plan Revision and Planning Project
- River Rehabilitation & Flood Protection - Other References
- Agricultural Development Planning & Training





