Kastamonu Water Supply and Sanitation Project (ru)
Kastamonu
The following studies have been executed within the scope of the preparation of the Feasibility Study to define the requirements of water supply system, wastewater and stormwater system, WWTP and WTP for Kastamonu having equivalent population 100 000 in the design target year 2025:
Client
Municipality of Kastamonu
Partner
Dorsch Consult Wasser & Umwelt GmbH (Germany)
Financing
Kreditanstalt für Wiederaufbau (KfW)
Duration of Services
2005 - 2006
Brief Description of the Project :
Scope of Services :
- Municipal Infrastructure (ru)
- Water Supply and Distribution (ru)
- Düzce Drinking Water Structures Detail Design (ru)
- Kırşehir Water Supply System Rehabilitation Project (ru)
- Azerbaijan - Consultancy Services for Water and Wastewater Networks, WTP and WWTP in 22 Regions (ru)
- Technical Assistance to Prepare Drinking Water Supply Projects for 8 Municipalities in Turkey (ru)
- Antalya Sewerage System Network Construction and Water Network Rehabilitation Project (ru)
- Kastamonu Water Supply and Sanitation Project (ru)
- Siirt Water Supply and Sanitation Project (ru)
- Water Supply and Conveyance System to Muscat and Quriyat from Wadi Dayqah Dam (ru)
- Batman Water Supply and Sanitation Project (ru)
- Aliağa Organized Industrial Zone Consultancy Services for Infrastructure Works (ru)
- Mardin Kızıltepe Water Supply Project (ru)
- Greater Istanbul Water Supply Project, Melen System (ru)
- Antalya Water and Sanitation Project (ru)
- Water Supply and Distribution - Other References (ru)
- Water Treatment Plants (ru)
- Wastewater and Stormwater Drainage (ru)
- Wastewater Treatment Plants (ru)
- Solid Waste Management (ru)
- Institutional Strengthening and Technical Assistance (ru)
- Water Supply and Distribution (ru)





