Azerbaijan Irrigation Distribution System and Management Improvement Project (IDSMIP) (ru)
Azerbaijan
International and national Technical Assistance services have been foreseen within the activities related to this Component 2. The task of these teams is to ensure that an effective design is prepared for the improvement of efficiency and sustainability of irrigation water distribution on 56 000 ha area by assisting in the selective rehabilitation and improvement of On-farm irrigation and drainage infrastructure of 45 WUAs. In addition, Off-farm works associated with the On-farm works will be rehabilitated to ensure sufficient and timely water delivery to project WUAs. The works within the scope of Component 2: Component 2: Design and Construction Supervision for the Rehabilitation and Modernization of On-Farm and Off-Farm Infrastructure (DCSRMOOI)
Client
Republic of Azerbaijan
Amelioration and Water Farm Open Joint Stock Co. (AWFOJSC)
Partner
SULACO Consulting Engineering Co. Ltd. (Azerbaijan)
Financing
World Bank
Duration of Services
2006 – Ongoing
Brief Description of the Project :
Scope of Services:
- Dams and Water Resources (ru)
- Dams (ru)
- Irrigation & Drainage Systems (ru)
- Water Users Association Development Support Project (WUAP) (ru)
- Tunca (Suakacağı) Dam and HEPP Irrigation Project (ru)
- Azerbaijan Irrigation Distribution System and Management Improvement Project (IDSMIP) (ru)
- Libya, Sirt END and Sirt B Pump Stations (ru)
- Azerbaijan, Velvelichay – Tahtakorpu Conveyance Canal (ru)
- Azerbaijan, Khanarc Canal Project (ru)
- Atabey and Keçiborlu Plains Irrigation Project (ru)
- Mardin - Ceylanpınar Plains Irrigation Project (ru)
- Irrigation & Drainage Systems - Other References (ru)
- Water Resources Planning (ru)
- River Rehabilitation & Flood Protection (ru)
- Agricultural Development Planning & Training (ru)





