Water Users Association Development Support Project (WUAP) (ru)
Azerbaijan
The two primary objectives of the assignment are to (i) develop designs, drawings and tender documents for the I&D rehabilitation and modernization works in about 34 WUAs, 15 core raions, covering some 85,000 ha, to be carried out under Component 2 of WUAP, and (ii) provide construction supervision and quality control. All works to be carried out in accordance with international standards. Three secondary objectives are to (i) prepare digitized maps for all WUAs that benefit from rehabilitation and 15 core raions, (ii) assist PIU with the provision of excavators to eligible WUAs, and monitor their subsequent use; and (iii) review the compliance of the design and construction supervision with the Resettlement Framework Policy. The works within the scope of Component 2:Component – 2: Design and Construction Supervision for the Rehabilitation of On-Farm Infrastructure
Client
Republic of Azerbaijan
Amelioration and Water Farm
Open Joint Stock Co. (AWFOJSC)
Partner
SULACO Consulting Engineering Co. Ltd. (Azerbaijan)
Financing
World Bank
Duration of Services
2012 - Ongoing
Brief Description of the Project:
Scope of Services:
- Dams and Water Resources (ru)
- Dams (ru)
- Irrigation & Drainage Systems (ru)
- Water Users Association Development Support Project (WUAP) (ru)
- Tunca (Suakacağı) Dam and HEPP Irrigation Project (ru)
- Azerbaijan Irrigation Distribution System and Management Improvement Project (IDSMIP) (ru)
- Libya, Sirt END and Sirt B Pump Stations (ru)
- Azerbaijan, Velvelichay – Tahtakorpu Conveyance Canal (ru)
- Azerbaijan, Khanarc Canal Project (ru)
- Atabey and Keçiborlu Plains Irrigation Project (ru)
- Mardin - Ceylanpınar Plains Irrigation Project (ru)
- Irrigation & Drainage Systems - Other References (ru)
- Water Resources Planning (ru)
- River Rehabilitation & Flood Protection (ru)
- Agricultural Development Planning & Training (ru)





