SU-YAPI Engineering & Consulting Inc.

(Taşkent - Ermenek) Junction- Balcılar (Relocation) Highway

Konya, Turkey

Client General Directorate of Highways (KGM)
3rd Regional Directorate - Konya
Partner -
Financing Local
Duration of Services 12/2016 – 04/2018
Brief Description of the Project :

This project was planned as Dam Relocation road because existing road with 42-37 control section no that provides transportation between Taşkent and Balcılar within the boundaries of Konya Province is located at Afşar Dam site. The whole project area is located at rough terrain and the road is designed to be 14.38 km long and 2x1 lane.

Scope of Services :

Road Final Design: 14,38 km

Drainage Design: 14,38 km

Traffic Designs: 14,38 km

Intersection Designs

Post-tensioned Balanced Cantilever Bridge Detail Design: 1 No.

Spans: 95.75 + 175.00 + 95.75 = 366.50 m
Pier Height: 95.00 m and 70.00 m., 
Area: 1759 m2, Height from Thalweg 150 m.

Tunnel Preliminary and Final Designs (including electromechanical design): 4 Nos

Afşar Tunnel                  440 m
Karagedik Tunnel          555 m
Çetmi Tunnel               1 770 m
Balcılar Tunnel               300 m
Total                              3 065 m

Engineering Investigation Services:

  • Geological Survey and Report,
  • Hydrogeological Survey and Report,
  • Engineering Geology Survey and Report,
  • Geological-Geotechnical Investigation Program,
  • Geological-Geotechnical Survey and Design Report,
  • Road Geotechnical Design Report,
  • Bridge Geotechnical Design Report,
  • Road Superstructure Survey and Design Report.