(Taşkent - Ermenek) Junction- Balcılar (Relocation) Highway
Konya, Turkey
This project was planned as Dam Relocation road because existing road with 42-37 control section no that provides transportation between Taşkent and Balcılar within the boundaries of Konya Province is located at Afşar Dam site. The whole project area is located at rough terrain and the road is designed to be 14.38 km long and 2x1 lane. Road Final Design: 14,38 km Drainage Design: 14,38 km Traffic Designs: 14,38 km Intersection Designs Post-tensioned Balanced Cantilever Bridge Detail Design: 1 No. Spans: 95.75 + 175.00 + 95.75 = 366.50 m Tunnel Preliminary and Final Designs (including electromechanical design): 4 Nos Afşar Tunnel 440 m Engineering Investigation Services:
Client
General Directorate of Highways (KGM)
3rd Regional Directorate - Konya
Partner
-
Financing
Local
Duration of Services
12/2016 – 04/2018
Brief Description of the Project :
Scope of Services :
Pier Height: 95.00 m and 70.00 m.,
Area: 1759 m2, Height from Thalweg 150 m.
Karagedik Tunnel 555 m
Çetmi Tunnel 1 770 m
Balcılar Tunnel 300 m
Total 3 065 m