Netherlands - KW21-A, KW21-B, KW22, KW23, KW25, KW31, KW32 Bridges and Viaducts
Rotterdam, Netherlands
Engineering and design works for KW21-A, KW21-B, KW22, KW23, KW25, KW31, KW32 bridge and viaducts to be constructed under the scope of AMS#4557438 main contract that is signed between “De Staaat der Nedelandern, Ministerie van Infrastructuur en Waterstall” (RWS) (Dutch government institution) and BAAK EPCM v.o.f. 165.00 (North) 235.00 (South)
Client
BAAK EPCM v.o.f
Partner
-
Financing
Local
Duration of Services
04/2018 - 12/2022
Brief Description of the Project :
Name
Span No
Maximum
Span (m)Total
Length (m)Structure
KW21A
6
47.40
220.00
Post-tensioned Bridge
KW21B
4
51.40
145.00
Post-tensioned Bridge
KW22
7
45.50
285.36
Post-tensioned Bridge
KW23
7
57.95
369.63
Post-tensioned Bridge
KW25
1
51.00
51.00
Post-tensioned Bridge
KW31
2
31.90
62.19
Post-tensioned Bridge
KW32
2
33.18
55.75
Post-tensioned Bridge
KW22 Part 1
3
60.50
156.00
Post-tensioned Bridge
Revision
KW22 Part 2
1
52.00
52.00
Post-tensioned Bridge
Revision
MAASDELTA
Tunnel Modelling
Add. Scope
Scope of Services :





