Netherlands - KW21-A, KW21-B, KW22, KW23, KW25, KW31, KW32 Bridges and Viaducts

Rotterdam, Netherlands

Client BAAK EPCM v.o.f
Partner -
Financing Local
Duration of Services 04/2018 - 12/2022
Brief Description of the Project :

Engineering and design works for KW21-A, KW21-B, KW22, KW23, KW25, KW31, KW32 bridge and viaducts to be constructed under the scope of AMS#4557438 main contract that is signed between “De Staaat der Nedelandern, Ministerie van Infrastructuur en Waterstall” (RWS) (Dutch government institution) and BAAK EPCM  v.o.f.

 Name Span No Maximum
Span (m)
Total
Length (m)
Structure
 KW21A 6 47.40 220.00  Post-tensioned Bridge
 KW21B 4 51.40 145.00  Post-tensioned Bridge
 KW22 7 45.50 285.36  Post-tensioned Bridge
 KW23 7 57.95 369.63  Post-tensioned Bridge
 KW25 1 51.00 51.00  Post-tensioned Bridge
 KW31 2 31.90 62.19  Post-tensioned Bridge
 KW32 2 33.18 55.75  Post-tensioned Bridge
 KW22 Part 1 3 60.50 156.00  Post-tensioned Bridge  Revision
 KW22 Part 2 1 52.00 52.00  Post-tensioned Bridge  Revision
 MAASDELTA

165.00 (North)

235.00 (South)

 Tunnel Modelling  Add. Scope
Scope of Services :
  • Reviewing and verifying the design data submitted by Client,
  • Structural designing according to Eurocode and local specifications,
  • Analyzing and calculating superstructures and infrastructures (ground structures, soil retaining structures, side foot and middle foot),
  • 3D modelling with Revit / Allplan and AutoCAD, drawings of plan/section and detailed reinforcements, 
  • Preparing final design calculation reports and designs,
  • Preparing detail designs,
  • Preparing necessary design data for the supply of detailed engineering materials for Bear and Expansion Joints,
  • Preparing list of bills of quantities.
  • Additionally, “Maasdelta Tunnel” modelling in LOD400 Level is carried out, including formwork and reinforcement detailed modelling.