logo
SU-YAPI Engineering & Consulting Inc.
RSS

News

“UNOPS Design Services" contract signed. 23 May 2022
foto
SU-YAPI/KREDO Joint Venture signed a 3-year LTA (Long Term Agreement) with UNOPS (United Nations Office for Project Services) on 16.05.2022. Being active in more than 80 countries around the world under the United Nations, since its establishment in 1973, UNOPS has been carrying out projects especially on infrastructure, transportation, environment, and renewable energy in order to help people build better lives and achieve peace and sustainable development in countries.
[More]
Export Champions of the Service Sector Announced. 30 December 2021
foto
Despite the pandemic, companies that enabled the industry to export approximately 35 Billion Dollars in exports and a foreign trade surplus of 11.5 Billion Dollars with their successful performance in 2020 were awarded by the Services Exporters' Association for their success.
[More]
“Revision of Ceyhan Basin Flood Management Plan” contract was signed. 19 November 2021
foto
The contract for the "Revision of Ceyhan Basin Flood Management Plan" was signed on 19.11.2021 between the General Directorate of Water Management, which is affiliated to the Ministry of Agriculture and Forestry, and Su-Yapı, under the leadership of Mr. Bilal Dikmen, General Manager of Water Management. Mr. M. Özgür Özatay, Deputy Chairman of the Board of Directors, Mr. Korhan İlter, Deputy General Manager, Mr. İsmail Fidan, Business Development and Offers Director, and Mr. Orhan Türkmen, Project Manager, attended the signing ceremony to represent our company.
[More]
“Diyarbakır – Çüngüş Oyuklu Dam Design” contract was signed. 6 September 2021
foto
The contract for the "Diyarbakır - Çüngüş Oyuklu Dam Design", which was tendered by the General Directorate of State Hydraulic Works, Department of Dams and HEPP, was signed on 06.09.2021. Final project services will be provided for the clay core rock fill type dam for irrigation water purposes, with a height of 39.20 m from Thalweg, 8 km away from the Cüngüş district in the west of Diyarbakır.
[More]
“Consultancy Services for Osmaniye Water Supply and Sewerage Project” contract is signed. 29 July 2021
foto
“Consultancy Services for Design Review, Preparation of Bidding Documents and Construction Supervision for Osmaniye Water Supply and Sewerage Project” contract within the scope of the Municipal Services Development Project (FRIT II), financed by the European Union and the World Bank, and carried out by ILBANK and the World Bank, is signed by SU-YAPI / ÜÇER Joint Venture on 29.07.2021.
[More]
Cooperation Protocol signed between Su-Yapı and Nippon Koei 6 April 2021
foto
Our company has signed a cooperation protocol with the Japanese company Nippon Koei, one of the world's largest engineering companies, with which we have been conducting business development activities together in many countries for a long time. The purpose of this cooperation is to ensure that both companies work together in selected projects by conducting international joint business development activities and to transfer information and technology between the two companies.
[More]
"Ankara Province Drinking Water, Wastewater and Stormwater Management Master Plan" contract was signed. 7 April 2020
foto
The contract for "Ankara Province Drinking Water, Wastewater and Stormwater Management Master Plan" is signed between Ankara Water and Sewerage Administration General Directorate (ASKİ) and TEMELSU - SU-YAPI Joint Venture on 7 April 2020. The project aims to meet the current and future water needs of the population of Ankara in the next 30 years and to improve and develop existing drinking water, wastewater, stormwater flood protection and prevention systems and update existing plans and reports to ensure the sustainable development of Ankara.
[More]
Civil Engineering Summit (CESUMMIT’20) was held at METU. 24 February 2020
foto
The Civil Engineering Summit (CESUMMIT’20), organized by IACES METU Local Committee, was held on 22-23 February 2020 at Middle East Technical University (METU). At the summit, SU-YAPI gave a visual presentation in METU U3 Lecture Hall about “Structural and BIM- Design of Rotterdam Bridges in All Aspects” and give information to participants about the company profile and projects performed with BIM.
[More]
191 km long expressway between Bidbid and Al Kamil W’al Wafi in Oman is opened for traffic. 23 January 2020
foto
Oman’s engineering marvel the Al Sharqiyah Expressway is opened for traffic on 20 January 2020. The 191 km long expressway is located Bidbid and Al Kamil W’al Wafi. According to the information of Oman Ministry of Transportation, this strategic three-lane road with a design speed of 120km/h will include bridges across wadis over heights up to 90 m. The road also includes the first-of-its-kind tunnel projects built in Oman that are over 2.1 km long in total. The first tunnel is located near Nidab village in Samayil that is 650 m long while the second one is located in the mountain range of Wadi Alaq, which is 1.450 m long.
[More]
European connection of Trans Anatolian Natural Gas Pipeline Project (TANAP) is opened. 30 November 2019
foto
European connection of Trans Anatolian Natural Gas Pipeline Project (TANAP) aiming to transfer the natural gas produced from Shah Deniz field of Azerbaijan to Turkey and onwards to Europe, for which SU-YAPI provide consultancy services, has been opened with the participation of President Recep Tayyip Erdoğan and Azerbaijani President İlham Aliyev with the ceremony held in Ipsala district of Edirne (Metering Station MS4) at the Greece border, on Saturday, November 30, 2019. A delegation representing our company has also participated in the ceremony.
[More]