Highways, Motorways and Bridges (ru)
Client Duration of Services Project Name Scope of Services Final Design Final Design Final Design General Directorate of Highways Final Design Final Design Detail Design
General Directorate of Highways
2013-Ongoing
Armutlu – Gemlik State Highway
32.5 km long, highway
KRG /Iraq
Ministry of Construction and Housing2013-Ongoing
Rovia-Gopal Highway (Duhok)
Erbil – Gopal Highway (Erbil)
Darbandikhan - Kalar Highway (Suleymania)Detail Design and Supervision Services
21 km long, highway
37 km long, highway
41 km long, highway
KRG /Iraq
Ministry of Construction and Housing2013
Penjween Darbandikan Bridge Darbandi Rania Bridge
Design Review for 2 bridges
(190 m and 330 m span)
General Directorate of Highways
2012-Ongoing
Kütahya - Uşak (Between Çavdarhisar - Abide) State Highway
47.2 km long, highway
General Directorate of Highways
2012-2014
Demirci - Selendi
State Highway
47.7 km long, highway
General Directorate of Highways
2012-2013
(Malatya-Yazıhan) Branching – (Arapgir-Keban)Branching State Highway
Final Design
52.4 km long, highway
2010-2011
(Nurdağı-Gaziantep) Branching – Musabeyli – Kilis State Highway
Final Design
59 km long, highway
General Directorate of Highways
2010-2011
Erciş - Patnos
State HighwayFinal Design
42 km long, highway
General Directorate of Highways
2004-2007
Suşehri - Koyulhisar Branching- 7th Regional Limit & Suşehri Branching - Refahiye Branching - Kelkit Branching State Highway
Final Design
52 km long, 2 x 2 lane highway
General Directorate of Highways
2004-2005
Ahlat - Karahasan - Malazgirt Road
Final Design
35,15 km long, highway
Adapazarı Metropolitan Municipality
2003
TERRA 1 – Consulting and Construction Supervision Services for the Reconstruction of Asphalt, Pavement Stones and Pedestrians in Adapazarı City Center Section 2
Construction Supervision
Paving avenues and streets 110 km in total with asphalt and pavement stones, incl. Sidewalks
General Directorate of Highways
2002-2005
(Ankara - Eskişehir) Branching - 3. Regional Boundary Highway
Final Design
31 km long highway
General Directorate of Highways
2000-2005
(Beyşehir- Şarkikaraağaç) Branching - Hüyük – Argıthanı Highway
Final Design
68,10 km long highway
General Directorate of Highways
1998-2005
Samsun Western Bypass Road
Final Design
10,60 km road, 1,02 km twin-bore tunnel and 3 nos interchanges
General Directorate of Highways
1998-2003
Ankara – Kastamonu Highway Ilgaz Mountain Tunnel Crossing
Pre-design and final design
17,40 km long road and 4,38 km long tunnel
(ESBAŞ) Ege Serbest Bölge Kurucu ve İşleticisi A.Ş.
1998-2001
Aegean Free Zone Interchange (ESBAŞ)
Detail Design
Interchange
General Directorate of Highways
1998-2001
(Türkeli-Ayancık) Branching and (Taşköprü-Boyabat) Branching Highway
41,98 km long highway, 1 no bridge
General Directorate of Highways
1996-2001
Bergama Branching-Ayvalık-the 14th Regional Boundary Highway
83,85 km long highway, including 25 nos junctions, 8 nos bridges
General Directorate of Highways
1996-2001
Mengen – Devrek Highway Dorukhan Tunnel
Pre-design and Final Design
1,83 km long highway, 1,02 km long tunnel
General Directorate of Highways
1996-2000
Kumburgaz and Selimpaşa Interchanges
Final Design
2 nos interchanges
General Directorate of Highways
1991-1993
Kızılcahamam – Güdül - Ayaş Branching Highway
Final Design
52,64 km long highway
Kutlutaş – Dillingham Joint Venture
1991-1992
İzmir-Aydın Motorway Bridges and Overpasses
7 nos motorway bridges and 1 no overpass
General Directorate of Highways
1990-1995
Fatsa-Aybastı-Reşadiye Highway
Final Design
88,63 km long highway, 6 junctions and 3 nos bridges





