NABUCCO - Turkey – Austria Natural Gas Pipeline Project Turkish Section Engineering Services and Feasibility Study (ru)
Turkey
The “NABUCCO Natural Gas Pipeline Project” covers high-pressurized pipeline and associated structures for transmission of 31 billion m3/year natural gas, scheduled for supply from the Middle East and Caspian countries of operation, to Austria via Turkey-Bulgaria-Romania-Hungary for 50 years. The total length of studied lines within Turkey including the alternatives is 4,500 km. The feasibility study has been carried out.
Client
BOTAŞ - Boru Hatları ile Petrol Taşıma A.Ş.
Partner
-
Financing
Local
Duration of Services
2004 – 2005
Brief Description of the Project :
Scope of Services :
- Energy (ru)
- Hydroelectric Power Plants (ru)
- Oil & Natural Gas (ru)
- TANAP - Trans Anatolian Natural Gas Pipeline Project (ru)
- NABUCCO Natural Gas Pipeline Project Between Turkish/Georgian Border (Posof) - Ankara Pipeline Section Engineering Services (ru)
- NABUCCO - Natural Gas Pipeline Project Between Ankara – Turkish/Bulgarian Border Pipeline Section Engineering Services (ru)
- NABUCCO - Turkey – Austria Natural Gas Pipeline Project Turkish Section Engineering Services and Feasibility Study (ru)