Boyabat Dam & HEPP (ru)
Sinop
Boyabat Dam & HEPP Project is in the Lower Kızılırmak basin, some 123 km in land of the Black Sea, in 10 km SW of Durağan county seat of Sinop province in the north of Turkey. The project area on the Kızılırmak River is surrounded by the Ilgaz Mountains in the north and west, the Kunduz and Çal Mountains in the south and Altınkaya Dam reservoir in downstream. Dam design characteristics; Type : Concrete Gravity Dam Crest Elevation : 335,00 m Crest Length : 262 m Height from Thalweg : 150,00 m Height from Foundation : 195,00 m Concrete Volume : 2.3 x 106 m3 Reservoir Area : 65,4 km² (at 330 elevation) Max. Water Level : 330 m Total Reservoir Volume : 3557 x 106 m³ (at 330 m elevation) Number of units : 3 Turbine Type : Vertical Axis Francis Unite Installed Power : 176 MW Total Installed Power : 528 MW Annual Energy Generation : 1.500 x 106 kWh/year
Client
BOYABAT Elektrik Üretim ve Tic. A.Ş.
Partner
-
Financing
Local
Duration of Services
2008 - 2012