İçeriğe Atla Menüye Atla
logo

Malatya Wastewater Plant (ru)

Malatya

Client Municipality of Malatya
Partner Dorsch Consult Wasser & Umwelt GmbH (Germany)
Financing Kreditanstalt für Wiederaufbau (KfW)
Duration of Services 2002 – 2007
Brief Description of the Project :

Malatya WWTP forms the major part of Malatya Sewerage Project. This project aims the disposal of the collected wastewater safely, providing the environmentally safe conditions and prevention of the pollution of Karakaya Dam reservoir.

The project has been designed for:

  • 1st Stage (Year 2010) as aerated active sludge,
  • 2nd Stage (Year 2020) and
  • 3rd Stage (Year 2030) as activated sludge
  • Project population (Year 2010) = 720,000 people
  • Population of Project Area (Year 2010) = 18.000 m3/h
  • Projected population (Year 2030) = 1,200,000 people
  • Population of Project Area (Year 2030) = 30.000 m3/h
Scope of Services :
  • Review and approval of detail design,
  • Construction supervision,
  • Commissioning,
  • Supervision of Defects Liability Period.