Antalya Water and Sanitation Project (ru)

Antalya

Client Antalya Water and Sewerage Administration (ASAT)
İş Ortağı Sir Alexander GIBB & Partners (UK)
Financing World Bank
Duration of Services 1996 - 1999
Brief Description of the Project :

The scope of works covers; the evaluation of tenders for water supply and waste water collection, treatment and disposal construction packages, awarding of the contracts, supervision of the works during the construction, acceptance of the works and commissioning of the facilities in Antalya.

Construction contracts within the scope of the consultancy and supervision services;

Contract No : 11         Construction of Duraliler Force Main, Water Distribution Networks of Pressure Zones IIB and VI; TM6 Pump Station, DIA, DII-2, DVI Reservoirs and Construction Works for Immediate Measures

Contract No : 12           Construction of Water Distribution Networks of Pressure Zones I, III and IV

Contract No : 15          Construction of Duraliler Facilities, TM4 Pump Station, Fence and Construction Works for Immediate Measures

Contract No : 25           Construction of KK Collector and Zones No: 27, 29, 30, 31 Sewer Networks

Contract No : 26           Construction of the Waste Water Treatment Plant

Contract No : 27           Material Supply, Construction and Installation of the Sea Outfall

Contract No : 28         Construction of Collector KE, Sewer Networks in Zones 1, 2, 6, 7, 8, 9, 10, 19, 28 and Pump Stations TM1 and TM2

Contract No : 29          Construction of Sewer Networks in Industrial Zone 33 and Historical/Archeological Zone 31, Rehabilitation of Pump Station TM5A and Construction of Force Main.

Scope of Services :
  • Evaluation of bids for construction works,
  • Technical assistance to the Client during bid evaluation,
  • Construction supervision services,
  • Supervision of Defects Liability Period.