Filyos Creek Basin Master Plan Revision and Planning Project (ru)

Karabük, Zonguldak

Client DSİ 23th Regional Directorate - Kastamonu
İş Partner -
Financing Local
Duration of Services 1999 – 2002
Brief Description of the Project :

a) Filyos Creek Basin Master Plan Revision  :

  • Araç Valley pumped irrigation (2.574 ha), Konarı pumped irrigation (1.670 ha) and Başköy pumped irrigation (471ha) areas soil classification studies,
  • Çaycuma Plain pumped irrigation, Araç Valley pumped irrigation, Konarı pumped irrigation and Başköy pumped irrigation agricultural economy studies,
  • Land acquisition studies for Köprübaşı Dam & HEPP and Çay Dam & HEPP proposed for construction on Devrek Creek, Andıraz Dam & HEPP and Aktaş Dam & HEPP proposed for construction on Soğanlı Creek, and Araç Dam planned for construction on Araç Creek,
  • Land acquisition studies for Karasu and Buldan flood retarding dams planned for construction on tributaries of Devrek Creek, Pirinçlik, Şimşirdere and İncedere flood retarding dams planned for construction on tributaries of Yenice Creek, Kılıçlar flood retarding dam planned for construction on Eflani stream, a tributary of Araç Creek, Akgeçit and Karıt flood retarding dams planned for construction on Araç Creek stem.
  • Land acquisition studies for Çakırköy dam, Hacıana dam, Hacıbağı Dam, Çobanoğlu Dam, Ağalar Dam, Eskipazar Dam and Karadere lagoon as storage structures under alternative solution for Çaycuma Plain irrigation,
  • Water use rights study covering the Filyos Creek catchment as a whole,
  • Flood survey on areas affected by the flood over Filyos Creek catchment,
  • Borehole drilling in material areas and on required sites for Köprübaşı Dam & HEPP, Çay Dam & HEPP and Andıraz Dam & HEPP,
  • For Çay Dam and HEPP site, mapping at scale 1/1000 including mapping at scale 1/500 for HEPP site.
  • Hydraulic studies covering the whole Filyos catchment, including water supply and flood calculations for proposed structures and flood calculations for Karabük provincial seat, Devrek and Yenice county seats as critical areas to be protected against flood.

b) Planning Engineering Services

  • Planning engineering services for Köprübaşı Dam & HEPP and Çay Dam & HEPP planned for construction on Devrek Creek, Andıraz Dam & HEPP planned for construction on Soğanlı Creek, and other storage structures for flood control planned for construction on Araç Creek.

c) Environmental Impact Assessment (EIA)

  • EIA Report for Köprübaşı Dam & HEPP and Materials Areas,
  • EIA Report for Çay Dam & HEPP and Material Areas,
  • EIA Report for Andıraz Dam & HEPP and Material Areas,
  • Under the Filyos Creek Downstream Flood Protection Project, EIA Preliminary Study Report for 2 Rock Quarries near Buldan Creek and in Sabunlar Village of Devrek sub-province of Zonguldak province.
Scope of Services :
  • Basic Data Collection,
  • Master Plan Revision,
  • Planning Engineering Services.