Skip to content Skip to navigation
logo
SU-YAPI Engineering & Consulting Inc.

Erection of Cable Crane at Yusufeli Dam is completed. 24 August 2015

Erection of Cable Crane is completed at YUSUFELİ DAM and HEPP, which is the world’s third highest double curvature arch dam, construction of which was awarded to LİMAK-CENGİZ-KOLİN (LCK) joint venture by State Hydraulic Works (DSİ), and detail designs of which are prepared by our company.