Skip to content Skip to navigation
logo
SU-YAPI Engineering & Consulting Inc.

Çine Dam & HEPP

Aydın

Client ÖZKAR İnşaat San ve Tic. A.Ş.
Partner -
Financing Local
Duration of Services 1995 - 2010
Brief Description of the Project :

Çine Dam and HEPP is constructed on the Çine Creek in 16 km Southeast of Çine sub-province of Aydın Province. 

The objective is irrigation, flood protection and energy generation, thereby total 22.358 ha arable land including 6.279 ha on Çine Plain, 13.079 ha on Koçarlı Plain and 3.000 ha on Söke Plain will be irrigated, approximately total 9.100 ha land will be protected against flood and 118 million kWh energy will be generated per annum.

Dam design characteristics;

Dam Type   : RCC (Roller Compacted Concrete)
Crest Elevation   : 265,00 m
Crest Length   : 362,38 m
Height from Thalweg  : 120,00 m
Height from Foundation: 136,50 m
Total Fill Volume : 1.600.000 m3
Reservoir Area   : 9,46 km2
Annual Average Water : 380.360.000 m3/year
Maximum Water Level : 264,85 m
Total Reservoir Volume : 360.000.000 m3/year
Number of Units  : 2 Nos.
Turbine Type   : Vertical Axis Francis
Unit Power  : 23,60 MW
Total Installed Power  : 47,20 MW
Annual Energy Generation: 118 Million kWh/year

Scope of Services :
  • Detail Design.