Eskişehir Municipal Urban Development Project Component 2 – Natural Disaster Risk Minimisation Project

Eskişehir

Client Metropolitan Municipality of Eskişehir
Partner Scott Wilson Kirkpatrick & Cons. Inc. (UK)
Financing European Investment Bank (EIB)
Duration of Services 2005 – 2010
Brief Description of the Project:

The objectives of the services is to minimize the risk of flooding damages by Porsuk River and reduction of leakage from the irrigation canals to underground water that endanger buildings around these canals. 

The services mainly cover the design review/design, preparation of tender documents, technical assistance to tender and contract award, and construction supervision of the following project components;

  • Improvement of Porsuk River Channel (approximately 8 kilometers) and landscaping,
  • Replacement of seven vehicle bridges
  • Evaluation of four existing pedestrian bridges from earthquake risks point of view and replacement / retrofitting of these pedestrian bridges
  • Seven new pedestrian bridges
  • Four water level control structure and one end water level control structure
  • Improvement works for existing irrigation mains (approximately 8.5 kilometers)
Scope of Services :
  • Design review/design,
  • Preparation of tender documents,
  • Technical assistance to tender and contract award,
  • Construction supervision of the project components.